No verified paper has been uploaded for AJKPSC-PMS Paper Accountancy & Auditing 2015 MCQs yet.
The MCQs below are drawn from the Accountancy & Auditing subject category.
Showing 451–460
of 4621 MCQs
Page 46 / 463
451
A manager responsible solely for the costs incurred by a company department belongs to which type of center?
A cost center is a segment of an organization where managers are held accountable for the costs incurred but not for generating revenue or making investment decisions. This structure allows management to monitor and control departmental expenses effectively, ensuring that operational costs remain within the budgeted limits established for that specific functional area.
452
A manager who is held accountable solely for the costs incurred within their department belongs to which type of responsibility center?
A cost center is a department or function within an organization where the manager is responsible for controlling costs but is not responsible for generating revenue or making investment decisions. Examples include maintenance departments, human resources, or accounting departments, where the primary objective is to provide services efficiently while staying within a predetermined budget.
453
What term describes the extent to which a manager can influence specific revenues, costs, profits, or investments?
Controllability is a fundamental concept in responsibility accounting. It measures the degree to which a manager has the authority and ability to affect financial outcomes. Evaluating performance based on controllable factors ensures that managers are held accountable only for items they can actually influence, which is essential for fair performance appraisal.
454
What is the primary basis for determining a fixed rate of charge within a resource allocation framework?
In resource allocation, particularly when applying slack or free-floating charge methods, the fixed rate is calculated based on the total capacity available. This ensures that overhead costs are recovered regardless of the actual level of utilization. While capacity used and utilization are relevant to operational performance, they do not serve as the standard base for setting fixed charges, which are designed to account for the total potential resource commitment.
455
What is the technical term for the vertical deviations between the actual observed data points and the values predicted by a regression line?
In regression analysis, residual terms are the vertical deviations or errors that occur between the predicted values from the estimated regression line and the actual observations. These residuals help to measure the model's effectiveness in capturing the variability of the data around the line of best fit, indicating how well the model explains the underlying data.
456
In regression analysis, determine the predicted cost value if the observed cost is 65 and the disturbance error is 32.
In a regression model, the observed value is the sum of the predicted value and the error term (residual). Mathematically, Observed = Predicted + Error. Rearranging to solve for the predicted value: Predicted = Observed - Error. Substituting the given values, 65 - 32 = 33. This calculation helps in assessing the accuracy of the regression model's predictions against actual data points.
457
What does the combination of a significant residual term and a negative slope coefficient typically indicate in a regression model?
A negative slope indicates an inverse relationship, where an increase in the independent variable leads to a decrease in the dependent variable. While the residual term represents unexplained variance, the negative slope specifically characterizes the inverse proportionality between the two variables being analyzed in the regression model.
458
In the context of regression analysis, what is the typical threshold for the correlation coefficient between two independent variables that suggests the presence of multicollinearity?
Multicollinearity occurs when independent variables in a regression model are highly correlated with each other, making it difficult to isolate the individual effect of each variable on the dependent variable. A correlation coefficient exceeding 0.7 is often cited as a rule of thumb indicating significant multicollinearity. This condition can lead to unstable coefficient estimates and inflated standard errors, which complicates the interpretation of the regression model's results.
459
Within the standard quantitative analysis process for estimating cost functions, which action is typically performed as the fourth step?
Plotting the data on a scatter diagram is a critical step in quantitative cost estimation. It allows the analyst to visually inspect the relationship between the cost and the cost driver, identify potential outliers, and determine if a linear relationship is appropriate before proceeding to formal regression calculations.
460
What is the formal classification of a fishbone diagram within quality management tools?
A fishbone diagram, also known as an Ishikawa or cause-and-effect diagram, is a structured visual tool used to systematically map out all potential causes of a specific problem or effect. By categorizing factors into branches such as people, methods, machines, and materials, teams can identify the root causes of quality issues, facilitating more effective problem-solving and process improvement initiatives within an organization.